It was necessary to expand the facilities for building larger boats, and more than one at a time, so a new shop is going up. The old shop was demolished and removed, additional concrete was pored and the new metal shop was brought in and assembled. This much was done by 4 guys in about 3 hours. Amazing! The fork lift came in handy while hoisting panels to the top. Next will be 1200 square feet of asphalt out in front. That should be done by the end of the month.